Skip to content
HelixFrame & Siding

Services · Exterior floors

Decking

A deck is a floor that lives outside. We frame ledgers, beams, and joists as structure first, then set the walking surface and the guard so the whole assembly feels like part of the house.

Decking

Design studio

One decking project. Change any part of it.

Drag to turn the model. Each control changes only the part it names, and the spec underneath updates with it.

Building the model
Drag to turn

Configure

Composite picture frame

Cedar · Cable railing

Board layoutPicture frame
Board materialComposite
Board colorCedar
RailingCable
Railing colorBlack
Fascia colorGraphite
StairsFront
Profile
Grooved-edge composite with hidden fasteners in cedar. A border board frames the field. Stairs come off the front edge. Stainless cable, posts at 6 feet or less, cables 3 inches apart, in black. Fascia in graphite.
Spacing
The gap the board maker specifies. Joists 16 inches on center, 12 under a picture-frame border.
Substrate
Joists on a flashed ledger or a freestanding beam, blocked where the border turns
Helix does
We frame the deck, set the boards, the railing, the stairs, and the fascia.
Partner does
Footings, when the piers are not already in the ground.

Before and after

Drag across the job.

After: Decking
BeforeAfter
A back door onto dirt, then a composite deck with a picture-frame border.

What is in the scope

  • 01Ledger flashing and structural attachment to the rim
  • 02Posts, beams, joists, and stair stringers
  • 03Composite, cedar, and hardwood walking surfaces
  • 04Guards and handrails that pass the local code check

Typical sequence

  1. 1Confirm height, drainage, and the door threshold
  2. 2Set the frame and have it inspected before the decking hides it
  3. 3Install the surface, picture-frame borders, and stairs
  4. 4Finish with guards tied back to the structure

Partners Helix schedules